FG began the release of N350 b for capital projects which include:


1. Dualisation of Kano-Maiduguri Road (N13 b)


2. Lagos-Ibadan Express. (N5 b)


3. Benin-Sagamu Express (N8.7 b)


4. Gombe-Numan-Yola (N2.8 b)


5. Enugu-Onitsha (N5.5 b)


6. Ibadan-Ilorin (N6 b)


7. Second Niger Bridge (N13 b)


8. Odukpani-Itu-Ikot Ekp. (N6 b)


9. Ilorin-Jebba-Mokwa (N4.4 b)


10. Sokoto-Tambuwal-Kontagora-Makira (N8.8 b)


11. Oju/Loko n Bridge (N14.2b


12. Kano-Katsina (N2.6 b)


13. Sapele-Agbor Ewu (N2 b)


14. Apapa-Oshodi-Oworoshok N5b


‪#‎PleaseMonitorTheImplimentation.
Axact

Axact

Vestibulum bibendum felis sit amet dolor auctor molestie. In dignissim eget nibh id dapibus. Fusce et suscipit orci. Aliquam sit amet urna lorem. Duis eu imperdiet nunc, non imperdiet libero.

Post A Comment:

0 comments: